Home  >  Classifieds  >  Announcements  >  Public & Legal Notices
Place an Ad with the Baltimore Sun!

City Of Baltimore Department

CITY OF BALTIMORE DEPARTMENT OF PUBLIC WORKS OFFICE OF ENGINEERING AND CONSTRUCITON NOTICE OF LETTING Sealed Bids or Proposals, in duplicate addressed to the Board of Estimates of the Mayor and City Council of Baltimore and marked for Environmental Restoration Contract No. 4125-Impervious Area Removal at Various Locations will be received at the Office of the Comptroller, Room 204, City Hall, Baltimore, Maryland until 11:00 A.M. on Wednesday, July 11, 2018. Positively no bids will be received after 11:00 A.M. Bids will be publicly opened by the Board of Estimates in Room 215, City Hall at Noon. The Contract Documents may be examined, without charge, in Room 6 located on the first floor of the Abel Wolman Municipal Building, 200 N. Holliday Street, Baltimore, Maryland 21202 as of Friday, June 8, 2018 and copies may be purchased for a non-refundable cost of $50.00. Conditions and requirements of the Bid are found in the bid package. All contractors bidding on this Contract must first be prequalified by the City of Baltimore Contractors Qualification Committee. Interested parties should call 410-396-6883 or contact the Committee at 4 South Frederick Street, 4th Floor, Baltimore, Maryland 21202. If a bid is submitted by a joint venture (“JV”), then in that event, the document that established the JV shall be submitted with the bid for verification purposes. The Prequalification Category required for bidding on this project is D02800 Landscaping and F0220 Earthwork and Site Preparation Cost Qualification Range for this work shall be $500,000.01 to $1,000,000.00 A “Pre-Bidding Information” session will be conducted at the 3rd Floor Large Conference Room of the Office of Engineering & Construction, Abel Wolman Municipal Building on June 18, 2018 at 10:00 A.M. Principal Item of work for this project include, but are not limited to: The work consists of, but not limited to, removal of existing pavement or concrete, furnishing and placing topsoil, and grading to conform to proposed contours, seeding and mulching areas where pavement has been removed, planting trees and all incidental work necessary to complete the project. This project is being funded with State Revolving Funds. The MBE goal is 18% The WBE goal is 16% ER CONTRACT NO. 4125 APPROVED: APPROVED: Bernice H. Taylor Rudolph S. Chow, P.E. Clerk, Board of Estimates Director of Public Works 5647850 6/8, 6/9/2018

Additional Information

Posted:
1 week, 3 days, 11 hours ago
Category:
Public & Legal Notices 

Browse Categories